The eLearning content should substantially aid the instructor to
• Visually/graphically explain the operation of BOP Unit with animations/Video, Demonstrate critical performance or maintenance areas.
• Constructing multiple levels of navigation to simulate areas not seen by naked eye.
What is BOP/BOP Control Unit
Blowout preventer (BOP) is a large valve that encases an oil well at surface. During drilling or well interventions, the valve may be closed if overpressure from an oil reservoir causes formation fluids such as oil and natural gas to back up within the wellbore and threaten the rig. By closing this valve (usually operated remotely via hydraulic actuators or called BOP Contol Units), the drilling crew can prevent explosive pressure release, thus regaining control of the reservoir pressure
Project Approach:
Phase-1
Identified Learning Needs/ Curicullam Objectives.
Co-ordinated with Subject Matter experts to collect the content/ manual/ associated Graphics.
Deliverables: Storyboard and Prototype
Phase-2
Use Instructional Writing to develop On-line Course
Apply appropriate Graphics (audio, Video, Animation, layouts) as per course content and build navigation and Interactivity
Completed the Video shoot of entire BOP Control Unit/ Conceptualized and Created animations.
Deliverables: Beta or Draft Version of the e-learning Content.
Phase-3
Review and Validate Content with the feedback given by users/instructors
Test The content in the actual Environment
Deliverables: Final Course Delivery
Swift Solution Pvt. Ltd. # 31, 14th Main, Agromore Layout, Atthiguppe Extn, (Near To Chandra Layout Water Tank), Vijaynagar, Bangalore - 560 040.
Copyright © 2022 Swift Solution Pvt Ltd..
Input your search keywords and press Enter.